Transport Construction

Photo gallery

Zahradnický Tunnel - January 2013
2013

Tomický Tunnel - January 2013
2013

Tomický Tunnel II - January 2013
2013

Construction of Zahradnický Tunnel on Railway Line Votice-Benešov u Prahy - October 2012
2012

Construction of Zahradnický Tunnel on Railway Line Votice-Benešov u Prahy - March 2012
2012

Olbramovický Tunnel - Upgrade of Railway Line Votice-Benešov u Prahy
2011

Opening Ceremony of Olbramovický and Votický Tunnel (Railway Line Votice – Benešov u Prahy)
2011

Blessing Ceremony and Placing of St. Barbara Statue to Tomický II. Tunnel Portal
2011

Blessing Ceremony and Placing of Statue of St. Barbara Statue to Tomický I. Tunnel Portal
2010

Ceremonial Breakthrough of Zahradnický Tunnel
2010

Blessing Ceremony of Statue of St. Barbara Statue and Groundbreaking Ceremony
2010

Construction Progress in January 2010
2010

Construction Progress in December 2009
2009

Construction Progress in October 2009
2009

 

Railway Line Upgrade, Section Votice–Benešov u Prahy

Investor:Správa železniční dopravní cesty, státní organizace
Designer:SUDOP PRAHA a.s.
Contractor:firmy EUROVIA CS, a.s. (vedoucí účastník), Subterra a.s. a Viamont DSP a.s. jako „Sdružení VoBen“
Implementation period:1. May 2009 - 31. May 2013
Railway Line Upgrade, Section Votice–Benešov u Prahy

The purpose of the upgrade was an increase of the speed on the railway line to a maximum of 160 km/h and increase of the transport capacity. This was achieved by a construction of the second rail track together with straightening of the track between the stations Votice and Benešov u Prahy. This section was about 18.3km long. 
Within this project Subterra a.s. constructed four tunnels - Olbramovický, Zahradnický, Tomický I and Tomický II.
Olbramovický Tunnel
The total length of the tunnel was 480m from which 360m were bored. Excavated sections at portals had the length of 120m.
Zahradnický Tunnel
The total length of the tunnel was 1044m from which 936m were bored. Excavated sections at portals had the length of 108m.
Tomický I and II Tunnels
The total length of the Tomický I tunnel was 324m from which 216m were bored. Excavated sections at portals had the length of 108m. The total length of the Tomický II tunnel was 252m from which 201m were bored. Excavated sections at portals had the length of 48m.