2009

montáž ocelových konstrukcí

Construction Progress in May 2009
2009

 

Underground Utility Tunnel Wenceslas Square – Line B

Investor:Hlavní město Praha, odbor městského investora
Designer:INGUTIS, spol. s r.o.
Contractor:Sdružení dodavatelů Subterra a.s. a Energie - stavební a báňská a.s.
Implementation period:1. November 2007 - 1. August 2009
Underground Utility Tunnel Wenceslas Square – Line B

Subterra a.s. constructed a new underground utility tunnel on the left side of Wenceslas Square (looking towards the National Museum) including interconnection to line A, C and to the existing utility tunnels (Vodičkova and Příkopy). The total length of the utility tunnel (including branches) is 266.5m. The depth of the vertical alignment of the new utility tunnel is about 12 m below the existing ground level